FDC has completed many projects for this client – those in this list involve major power
generation work.
• Standby Generator installation, Grindavik, Iceland
• Standby Generator Load banks, Dixon CA
• Standby Generator Installation, Port Hueneme CA
• Turbine Generator Installation, Cutler Maine
• Install two 1000 KW generators, Coronado, CA
• Install two CRAC Units, and 800 KW Generator with ATS, Yokosuka, Japan
• Co-Generator Power Plant repair, 29 Palms, CA
• Repair transformers and switchboards, Suitland, MD
Additionally, FDC has completed other projects for NAVFAC, including these:
• HVAC Chiller replacement, Yokosuka, Japan
• Installation of vibration damper and Fuel injection tubing, Cutler Maine
• Write Standard Operating Procedure manual, Cutler Maine
• HVAC Evaluation and Repair, 29 Palms CA
Other work for different agencies includes these projects:
• Federal Bureau of Investigation – Office renovation, Budapest, Hungary
• Fire Alarm and protection system installation, GSA Ashville, NC
• Provide security specialists to upgrade Policy and Procedures. U.S. Coast Guard
• Construction and space alterations for GSA At St. Elizabeth complex, Washington , DC